On this page
Use the original item numbers
Compare the location, photographs and explanation, then operate the relevant feature normally. Recheck drainage under ordinary use or open and close a previously sticking lock. Avoid destructive or unsafe tests.
Record the actual result
Mark each item as resolved, outstanding or requiring further observation. For a leak visible only after rain, agree a suitable follow-up condition. A dry day alone does not prove the cause is fixed, but there is no need to assume failure without evidence.
Confirm remaining work
Return the outstanding item numbers, symptoms and proposed next steps. Acknowledge completed work as well so both sides use the same version. Before signing a reinspection record, check that it describes the result accurately. Confirming that equipment works should not be confused with accepting unrelated contractual conditions.
For a leak discovered after handover, read Request a New Home Leak Repair Under Warranty.
Sources checked 4 November 2026: Department of Lands: condominium legislation.
This article is general information, not individual legal or financial advice. Details can change — please verify current requirements before making decisions.
Take the next step
Browse Chiang Mai homes or ask our local team for tailored help.